Paul White

Paul White has recently joined Oculus Building Consultancy. He has over 38 years of experience having worked in both public and private sector Building Control.

He was formally Head of Building Control for Caerphilly County Borough Council, and more recently NHBC in the private sector.

Paul became a Chartered Building Control Surveyor in 1990 and is also an authorised SAP assessor.

During his long career has worked on numerous large schemes including the Caerphilly Town Centre re-development project.

Over 38 years of experience having worked in both public and private sector Building Control.

CASE STUDY
Norland College - Bath

First established by Emily ward in 1892, Norland College has become world leader in childcare training centred around the child. Having moved to various locations in the past, the College is now based in Bath. Along with its location, the curriculum at Norland has changed and progressed with the times to offer the most up to date academic childcare training courses and the highest practice standards in line with the latest research.

Read More

CASE STUDY
Rosenberg House

On Tuesday 31st January Her Royal Highness, The Duchess of Cornwall came to celebrate the reopening of the newly modernised almhouse, Rosenberg House. Built in 1974, connecting to an early Georgian east wing, Rosenberg House is a grade II listed building that provides homes for some of St John’s Hospitals’ elderly local residents in Bath.

Read More

CASE STUDY
The Gainsborough Bath Spa

The Gainsborough building situated in the heart of Bath was formerly part of the City of Bath College. A Grade II listed building from the Georgian period designed by John Pinch the Elder. The conversion to a 5* luxury hotel presented many challenges. The new multi-storey Lower Borough Walls wing reflects the host building architecturally. In the heart of the hotel lies Spa Village Bath, which is quite unique insofar as it has access to the natural thermal mineral-rich waters, making it the only natural thermal spa inside a hotel in the UK.

The main stair protection was particularly challenging as enclosing it was not an option from a conservation perspective. A solution of discreetly placed fire curtains operating on the fire alarm system to provide protection was developed. There are also isolated areas with sprinkler protection to provide an alternative to passive fire protection.

Read More