The oldest cathedral in England to embrace this techonology

Gloucester Cathedral

As part of our ongoing work at the cathedral, we are proud to be part of this great endeavour to help reduce the cathedral’s annual energy costs by 25% by adorning it with 200 solar panels. The panels are part of an ambitious ten-year programme being undertaken by Project Pilgrim to help the building fulfil its role as a place of dynamic spiritual, civic and heritage activity at the centre of Gloucester. Located on the south side of the nave roof , the panels remain hidden from view. The energy will then be fed underneath the Lady Chapel to provide newley installed unfloor heating. 

Learn more about Project Pilgrim at Gloucester Cathedral

 

2018-19 Oculus Prize Winner

Oculus Prize for University of Bath RIBA Year 2 Detailed Design Winner Announced

Read More

Assent and Oculus - A new era

Oculus Building Consultancy are proud to announce the acquisition of the company by Assent Building Control. Assent are one of the foremost building control bodies in the country and have developed a reputation for service provision that is second to none.

Picture credit: JZA Photography

Read More