This websites use cookies. By continuing to browse the site you are agreeing to our use of cookies. For more details about cookies and how to manage them, see our cookie policy.

Paul White Area Manager - Bath

BSc (Hons), MRICS

Paul White has recently joined Oculus Building Consultancy. He has over 38 years of experience having worked in both public and private sector Building Control.

He was formally Head of Building Control for Caerphilly County Borough Council, and more recently NHBC in the private sector.

Paul became a Chartered Building Control Surveyor in 1990 and is also an authorised SAP assessor.

During his long career has worked on numerous large schemes including the Caerphilly Town Centre re-development project.

Over 38 years of experience having worked in both public and private sector Building Control.

CASE STUDY
Astley Castle

A 12th-century fortified manor which had been lying in ruins since a fire in 1978, Astley Castle had seen additions and revisions carried out in almost every century since Medieval times. Throughout its history the site has been owned by no less than three Queens of England.

The Landmark Trust boldly set out to reinstate occupancy of Astley Castle in a manner appropriate for the 21st century.  After careful recording, those parts of the building beyond pragmatic repair were taken down.  By inserting a groundbreaking modern holiday home into the shell of the ancient castle, the architects, Witherford Watson Mann, were able to both stabilise the ruin and create the next layer of the building’s history.  The results showcase how modern architecture can be unashamedly but sympathetically stitched into ancient fabric to significant effect.

Read More

CASE STUDY
Shakespeare's New Place / Nash's House

Spearheaded by the Shakespeare Birthplace Trust, a new oak and bronze gateway was created that opens on the original threshold of Shakespeare's New Place. This new permanent exhibition brings to life the story of Shakespeare's New Place and the personal life of its most famous occupant, and where he had his family home for 19 years. 

Read More

CASE STUDY
Castle Drogo - Phase 2

Oculus have been involved in the extensive works been done throughout Castle Drogo since 2013. The Grade 1 listed castle in Devon was constructed of granite and built between the years of 1911 and 1930, and designed by Edwin Lutyens. Castle Drogo was the last castle to be built in England.

Read More